Other locations needed work on areas connected to the new sidewalk such as a large section of a driveway as seen below.
A stack of rebar waiting to be cut and placed.
The finished driveway with the connecting, sloping sidewalk and the new asphalt strip connecting the road to the gutter.
Further down on the property they had completed the concrete work on the corner but still needed to do the sidewalk further up and some asphalt work.
Another area with freshly poured driveway.