About one month after the demolition pictures. Moving right along with the framing on the front of the building facing west
The north side which will have the drive-thru option
Back of the building facing east
Another view of the back of the building along with the pallets of wood for new walls
April 22, 2012
The north side which will have the drive-thru option
Back of the building facing east
April 22, 2012
Comments